Home/Bags of Concrete Calculator
Bag Calculator

Bags of Concrete Calculator

Calculate how many bags of concrete (40, 60, or 80 lb) you need for your project based on slab dimensions.

4580lb bags per yard
6060lb bags per yard
0cost to use

Bags of Concrete Calculator

Enter dimensions to calculate bags needed.

%

Bags of Concrete Formula

bags = total cubic feet ÷ bag yield (cu ft per bag)

Understanding Concrete Bags

Concrete Bag Sizes and Coverage

Bag SizeCubic Feet per BagBags per Cubic YardWater Required
40 lb bag0.30 cu ft90 bags3 quarts
50 lb bag0.375 cu ft72 bags3.75 quarts
60 lb bag0.45 cu ft60 bags1/2 gallon
80 lb bag0.60 cu ft45 bags3/4 gallon

The 80-lb bag offers the best value per cubic foot. The 60-lb bag is the practical choice for most DIYers.

When to Use Bags vs. Ready-Mix

  • Bags (under 1 CY): Fence posts, small footings, patching. Cost: - per bag (- per CY).
  • Ready-mix truck (1+ CY): Driveways, patios, foundations. Cost: - per CY.

The crossover point is approximately 0.75-1 cubic yard. Above that, ready-mix is cheaper, faster, and more consistent.

Mixing Concrete from Bags

Mix in a wheelbarrow or portable mixer. Add water gradually. The correct consistency is like thick oatmeal. One person can reasonably mix 10-15 bags (80 lb) per hour with a wheelbarrow.

Bags of Concrete Calculator FAQ

Calculate volume in cubic feet (length x width x depth in feet), then divide by cubic feet per bag: 0.30 for 40-lb, 0.45 for 60-lb, or 0.60 for 80-lb bags. Add 10% for waste.

You need 45 bags of 80-lb concrete mix per cubic yard. Each bag yields 0.60 cubic feet, and there are 27 cubic feet per cubic yard.

A standard 4x4 post in a 10-inch diameter, 36-inch deep hole requires 2-3 bags of 80-lb concrete. A 6x6 post needs 4-5 bags.

Ready-mix is cheaper above 0.75-1 cubic yard. Bags cost - per CY. Ready-mix costs - per CY delivered. Below 1 CY, bags avoid short-load surcharges.

Add approximately 3/4 gallon (3 quarts) of water per 80-lb bag. Start with slightly less and add gradually until reaching a thick, workable consistency.

Standard mix sets in 24-48 hours and reaches full strength in 28 days. Fast-setting concrete sets in 20-40 minutes and reaches walking strength in 2 hours.

jon - Yard Measurement Specialist